01
1. Document the transformer
Take one straight, readable photo of the nameplate. Add full-unit photos from several sides and close-ups of terminals, cabinets, gauges, radiators, leaks, corrosion or damage. Include quantity, condition and pickup ZIP code.
02
2. Receive a buyer review
We use the submitted information to identify the equipment and assess whether there is a potential purchase path. We may request missing specifications, additional photos, records or access details.
03
3. Confirm the transaction
If the equipment is a fit, confirm the assets, price, payment method, title or ownership documentation, taxes if applicable, removal scope, loading responsibility and timing in writing.
04
4. Coordinate a safe handoff
Pickup planning depends on weight, dimensions, fluid status, site access and loading resources. Installed or energized equipment requires qualified personnel and site authorization before removal.
05
What can change after the first review
A preliminary conversation is based on the information provided. Additional photos, serial-number verification, inspection findings, missing accessories, access restrictions or a different condition can change the available terms. Important assumptions should be written into the transaction documents.
06
Keep ownership and site authority clear
The seller should own the equipment or have documented authority to offer it. If the unit is on a customer, utility, landlord or demolition site, identify who can authorize access, de-energization, disconnection and removal. Clear authority prevents delays and protects everyone involved.